Project Description

This water main project replaces approximately 175 metres of 1959 100mm diameter cast iron water main.  This section of water main was identified as a high-priority replacement project based on the calculated risk using RiLCAMP (GVW risk tool) and high number of breaks.  The water mains are approximately 65 years old and are located in a highly corrosive area of soil (detrimental to metallic materials), with an average of 2.3 breaks per 100 metres, ranking it as having one of the highest densities of breaks in Greater Vernon Water (GVW).  