Estimated Start Date
Spring 2026
Estimated End Date
Fall 2028
Address
Allenby Way, Crescent and Place
Participating Community
City of Vernon
Status
Active
Project Description
This water main project will replace approximately 306 meters of 1981 vintage 150/200mm ductile
iron (DI) water main. These sections of water main were identified as a high-priority replacement
as they are in a corrosive soil area with multiple breaks. This project will connect the 150mm PVC
section installed under the high-pressure gas line in 2018, eliminating the DI sections of pipe on both sides as well as the length of Allenby Place and a section on Allenby Way.
Design has been approved as part of the 2026 budget and construction is anticipated to take place in 2028.
Image

Timeline
Complete
No
Contact Information
Bruce Van Calsteren
Kerr Wood Leidal Associates Ltd.
Phone: 250-308-6844
Email: bvancalsteren@kwl.ca